- Who it fits: homes, additions, renovations and commercial projects across Florida.
- Documents we deliver: structural calculations and drawings for permit, plan review responses and construction-stage support.
- Inputs we need: the project city or county, architectural drawings or a sketch with dimensions, photos of the existing structure for renovations, and any building department comments.
Chrome Stone Structural is a structural engineer in Florida for homeowners, contractors, architects and business owners across the state. We prepare the structural calculations and drawings that a Florida building department needs to review a permit, and we stay available to answer questions while the project is built.
We work on residential and commercial projects throughout the state, from additions and renovations to commercial tenant improvements.
Structural Engineering Services We Provide in Florida
- New homes and additions: foundations, masonry and wood-frame walls, beams, columns, roof framing and the connections that carry wind uplift down to the foundation.
- Renovations and wall removals: beam and column design when a load-bearing wall is removed or an opening is widened in an existing home or building.
- Commercial tenant improvements: partition and ceiling framing, roof reinforcement and supports for rooftop mechanical equipment and kitchen hoods.
- Canopies, patio covers and screen enclosures: steel, aluminum and wood framing with footings and attachment to the existing building.
- Retaining walls and site structures: reinforced concrete and masonry walls, pool and equipment pads, and fences.
- Foundation design: footings, slabs and grade beams based on the soils information available for the site.
Projects We Engineer Across Florida
- Homes: additions, second stories, load-bearing wall removal, new openings in block walls, lanais, pool decks and screen enclosures.
- Condominiums and associations: repair drawings after milestone and county inspection reports, for concrete, balconies, walkways and garages.
- Commercial: restaurant and retail build-outs, rooftop equipment supports, canopies, mezzanines and storefront changes.
- Storm and flood work: storm repairs, home elevations and elevated foundations.
Renovations, Additions and Repairs to Existing Buildings
Much structural work in Florida is on buildings that already stand. State law makes the Florida Building Code govern the alteration, modification and repair of buildings, not only new construction, so a renovation, an addition or a repair is designed to the code too. The work starts with what the building already has: its framing, its foundation and any original drawings.
Common examples are removing a load-bearing wall, adding a room or a second floor, cutting a new opening in a masonry wall, adding rooftop equipment and repairing damaged framing. In a flood zone, the substantial improvement rule described on this page can also apply.
An addition is built against a structure that was designed and built earlier, so the connection is part of the design. Hillsborough County’s residential structural detail requirements list “new to existing connection details for additions” as an item the plans must include, and its renovation page adds that structural details are required for any changes to interior bearing walls, beams and columns, with header and lintel sizes and locations. These details show where the new framing meets the existing wall, floor and roof, and how the new foundation relates to the old one. What cannot be confirmed from the original drawings, photos and measurements is marked on the drawings.
Modular Buildings in Florida: State Approval and Local Permits
Modular buildings, which Florida law calls manufactured buildings, are built in a factory to the Florida Building Code. Under Section 553.37 of the Florida Statutes, the state reviews and approves the manufacturer’s drawings and specifications, and a building must carry the state’s insignia of approval before it is installed. The building is still permitted by the local jurisdiction: Section 553.38 reserves site development, property line and onsite installation requirements to local authorities. That is where the engineering for the site-built work comes in: the foundation, the anchorage of the modules to it, and any porch, deck or addition built at the site. Custom or one-of-a-kind prototype buildings do not need state approval, but they must meet all local requirements where they are installed.
Changing the Use of a Commercial Space
Turning a shop into a restaurant, a clinic into a gym or a warehouse into a showroom is a change of use. The City of Tallahassee states that permits are required for alterations and changes of occupancies, and its commercial permit application asks for the existing or previous use and the proposed use.
The City of Tampa’s plan review list for commercial alterations shows what the drawings are checked for: the proposed occupancy and use, structural design criteria where required, wind speed and pressure, roof and floor live and dead loads, floor and roof framing plans, height and area calculations, a life safety plan, and the mechanical and electrical loads. A new use can bring heavier floor loads, new rooftop or kitchen equipment and new openings, so the structural review checks the existing framing for the loads the new use brings.
The Florida Building Code, Local Amendments and Permits
Florida has one statewide building code. According to the Florida Building Commission, the 8th Edition (2023) of the Florida Building Code took effect on December 31, 2023, and the Commission has posted materials for the 2026 update. Local departments review permits under it, and some have announced when the new edition will apply to new applications, so we check the edition for each project at the start. Our article on the 9th Edition and permit sets explains what changes.
The code is not identical everywhere. Under section 553.73 of the Florida Statutes, the Florida Building Commission adopts an updated code every three years, and counties and cities may adopt local technical amendments that are more stringent, no more than once every six months. A local amendment stays in effect only until the next edition of the code is adopted, when the commission reviews it.
Which department reviews the drawings depends on the address: the city’s building department inside city limits, or the county for unincorporated areas. Florida law also allows owners to use a private provider for plan review and inspections. Under section 553.79, the building official reviews the plans and specifications for compliance with the Florida Building Code before a permit is issued. That is why a design starts from the address: the code edition in force, any local amendments, and the jurisdiction’s own submittal rules. We confirm the reviewing department and its submittal method before the drawings start.
Repair Drawings After Milestone Reports
Since 2022, Florida law has required milestone inspections for condominium and cooperative buildings three habitable stories or taller once they reach 30 years of age (25 where the local agency requires it near salt water), then every 10 years, and Miami-Dade County runs its own building safety inspection program, which has been in place since 1975. The inspection itself is done by the engineer or architect the association or owner hires for it. When the report calls for repairs, the association needs drawings that a contractor can price and the building department can permit. We prepare those repair drawings and stay available during the work. See our article on condo milestone inspection repairs.
Flood Zones and Substantial Damage
Large parts of coastal Florida lie in mapped flood zones. When a building there is substantially damaged or substantially improved, floodplain rules can require the whole building to meet current elevation requirements. That decision shapes the whole project, so we look at it first. Our article on the Florida substantial damage rule explains how it works, and we design repairs and elevated foundations when they are needed.
Soils, Sinkholes and Foundations
Florida foundations sit on sandy soils over limestone, often with high groundwater, and parts of Central and West Florida have sinkhole activity. We design footings and slabs from the geotechnical report, and design foundation repairs for existing buildings with settlement and cracks, working from the geotechnical engineer’s findings when testing is needed.
Storm Repairs and Elevations
After a hurricane, many repairs need engineering before they can be permitted. We design the structural repairs for roof framing, walls, connections and foundations to the current Florida Building Code, and prepare the drawings and calculations the building department reviews. When a damaged home in a flood zone must be raised, we design the elevated foundation and the connections that tie the house to it. Our article on building in flood zone AE in Florida explains the elevation rules.
Reroofing an Older Florida Home
A roof replacement in Florida is also a chance to strengthen the house against wind, and state law requires some of that work. Section 553.844 of the Florida Statutes says that for site-built single-family homes, a roof replacement must include a secondary water barrier and the strengthening or correcting of roof-deck attachments and nailing. For certain homes in the wind-borne debris region, the statute also calls for roof-to-wall connections, within limits the statute sets. When a quarter or more of a roof section is repaired, replaced or recovered, that portion must meet the code in effect.
The roof-to-wall step is structural. The engineer checks how the trusses or rafters are tied to the walls and details straps or connectors that complete the load path for uplift. Our page on wind load structural design in Florida explains how those uplift forces are set.
Florida Cities We Serve
We work across the state, with dedicated pages for the larger metro areas:
- Miami and Miami-Dade
- Fort Lauderdale and Broward
- West Palm Beach and Palm Beach County
- Tampa and Hillsborough
- St. Petersburg and Pinellas
- Orlando and Central Florida
- Jacksonville and Northeast Florida
- Southwest Florida
Designing for Florida Wind
In Florida, wind usually controls the lateral design. We calculate wind pressures using ASCE 7 and the current Florida Building Code (FBC) for the project location, exposure and building geometry, then design a continuous load path from the roof to the foundation: roof sheathing and framing, uplift connectors, tie-beams, bond beams, reinforced masonry cells and foundation anchorage. That holds inland too: see our pages for Orlando and for St. Petersburg and Pinellas County.
For projects in the High-Velocity Hurricane Zone (HVHZ) of Miami-Dade and Broward counties, the code adds stricter design and documentation requirements, and we prepare the structural set with those requirements in mind. See our wind load and HVHZ structural design page for more detail. Our article on Florida wind load requirements explains how the design pressures are set.
What the Structural Calculations and Notes Show
County permit pages show what a structural calculation is built on. Hillsborough County’s residential structural design criteria list the building codes the project was designed under, the wind speed, roof and floor live and dead loads, the wind importance factor and building category, and the internal pressure coefficient. They also call for the design wind pressure in psf for the exterior and for components and cladding, with the exposure type. Other counties write their own lists.
The calculations turn these loads into member sizes and connection forces, so a plan reviewer can follow how each beam, post and connector was chosen. The drawing notes then say what the project is built from: the county’s plan pages call for footing size, reinforcement and the minimum concrete strength in psi, slab thickness, the size, grade and species of structural lumber, the sheathing thickness and nailing schedule, masonry wall thickness and foundation depth, and the manufacturer and model number of every required connector, with details showing a continuous load path from the foundation to the roof. Notes like these let the contractor order the right material and let the reviewer check the plans against the calculations.
Product Approvals for Windows, Doors and Roofing
Florida runs a statewide product approval system that works with the Florida Building Code. State law lists the product categories it covers, including panel walls, exterior doors, roofing, skylights, windows, shutters, impact protective systems and structural components. When a product has statewide approval and is used within the conditions of that approval, local jurisdictions cannot ask for further testing or a new submission. On permit drawings, the window, door, shutter and roofing products are checked against the design wind pressures the engineer calculates. The Florida Building Commission’s product approval site lets anyone search for approved products. Miami-Dade and Broward are in the High-Velocity Hurricane Zone, which has its own product requirements.
What You Receive
- Structural calculations for gravity and wind loads, organized so the plan reviewer can follow them.
- Structural drawings with foundation plans, framing plans, connection details and uplift schedules.
- Permit documentation from an engineer, ready to submit with the architectural set.
- Plan review responses when the building department returns comments on the structural sheets.
- Construction-stage support to answer contractor questions and review field changes.
How a Florida Structural Project Works
- Project review: you send the project city or county, the architectural drawings or sketches and a short description of the work. We confirm the structural scope and send a written proposal.
- Design and calculations: we determine the wind design criteria for the site, size the structural members and design the connections.
- Drawings and permit set: we deliver the structural calculations and sheets for permit submittal.
- Plan review: we respond to the structural comments from the building department.
- Construction: we stay available to the contractor for questions and changes during construction.
Structural and MEP Under One Team
Chrome Stone also provides MEP engineering in Florida: mechanical, electrical and plumbing design. In Gibsonton, for example, we designed the HVAC, plumbing and electrical systems for an ice cream shop tenant improvement. When one team handles the structure and the building systems, rooftop equipment supports, wind anchorage of equipment and roof openings are coordinated in the same drawing set.
Frequently Asked Questions
Do I need a structural engineer for my Florida project?
Florida building departments usually require engineered structural drawings for additions, removed load-bearing walls, new canopies and covers, retaining walls and most commercial work. If you are not sure, send us a short description and we will tell you what your project is likely to need.
Which parts of Florida do you work in?
We work on projects across Florida from our Miami office, including projects inside and outside the High-Velocity Hurricane Zone.
What do you need from me to prepare a quote?
The project city or county, the architectural drawings or a sketch with dimensions, photos of the existing structure for renovations, and any comments you have already received from the building department.
Which Florida Building Code edition applies to my project?
The Florida Building Commission lists the 8th Edition (2023), effective December 31, 2023, and has posted materials for the 2026 update. Florida law adopts each edition statewide, and the edition in effect on the date the permit application is submitted governs that permit, so we confirm the edition for each permit.
Who reviews my permit?
The city’s building department inside city limits, or the county for unincorporated areas. Florida law also allows a private provider for plan review and inspections.
Can you prepare repair drawings after a milestone report?
Yes. We prepare repair drawings for concrete, balconies, walkways and garages so the association can permit the work.
Do you design storm damage repairs?
Yes. We design the structural repairs to the current Florida Building Code and prepare the drawings and calculations for the permit.
Do you also design the MEP systems?
Yes. Mechanical, electrical and plumbing design is done by the same team, so the structure and the systems are coordinated.
What is a threshold building in Florida?
Florida law defines a threshold building as any building more than three stories or 50 feet tall. A building also qualifies when it has an assembly occupancy under the Florida Building Code, is larger than 5,000 square feet and has an occupant content of more than 500 people. Threshold buildings follow extra state rules during permitting and construction, so we check the definition at the start of a project, because it changes what has to be submitted with the structural drawings.
What is the coastal construction control line?
The coastal construction control line (CCCL) is a line set by the Florida Department of Environmental Protection along the state’s sandy beaches. Seaward of the line, special siting and design criteria apply, and unless the work is exempt, construction and excavation need a permit from the department. The department’s Map Direct viewer shows the line as a solid red line, so an owner can see where a parcel sits. For beachfront projects we prepare the structural drawings and calculations, including the wind load design that exposed coastal sites call for.
How do I find the flood zone for my Florida property?
Counties publish the flood maps online with an address search. Pinellas County runs a Flood Map Service, and Miami-Dade County has an interactive web tool where you enter the address to see the map. Zones labeled with the letters A or V are high-risk Special Flood Hazard Areas. Shaded Zone X is a moderate flood hazard and unshaded Zone X is a minimal one. Pinellas County notes that the flood map is used to set building requirements, so please send us the zone and the base flood elevation for your parcel with your project details.
How does a flood zone change the design of a new building?
In a mapped flood zone, the floor level and the foundation follow the local floodplain rules. Pinellas County, for example, requires new or substantially improved buildings to be built at least one foot above the base flood elevation, and it asks owners to learn the base and design flood elevations before plans are developed. In V and Coastal A zones, where wave action is expected, specific building criteria apply. We design the foundation, the elevated floor framing and the connections to the elevation the local department requires. See our St. Petersburg and Pinellas County page for projects there.
Sources
- Florida Building Commission, Florida Building Code Information
- The Florida Senate, Florida Statutes Section 553.73 (2025), Florida Building Code
- The Florida Senate, Florida Statutes Section 553.791 (2025), Alternative Plans Review and Inspection
- The Florida Senate, Florida Statutes Section 553.899 (2025), Milestone Inspections
- Miami-Dade County, building safety inspection program
- FEMA, Substantial Damage
- Florida Geological Survey, Sinkhole FAQ
- Florida Building Commission, High-Velocity Hurricane Zone provisions (Chapter 16, code development text)
- The Florida Senate, Florida Statutes Section 553.71 (2025), Definitions
- The Florida Senate, Florida Statutes Section 161.053 (2025), Coastal Construction
- Florida Department of Environmental Protection, Coastal Construction Control Line Program
- Florida Department of Environmental Protection, Apply for CCCL Permits
- Florida Department of Environmental Protection, Locate the CCCL
- Pinellas County, Flood Maps and Zones
- Pinellas County, Construction in a Floodplain
- Miami-Dade County, Flood Zone Maps
- The Florida Senate, Florida Statutes Section 553.842 (2025), Product evaluation and approval
- Florida Building Commission, Product Approval
- Hillsborough County, Residential New Construction Structural Detail Requirements
- Hillsborough County, Residential Alterations (Renovations)
- Hillsborough County, Residential New Construction Structural Design Criteria
- Hillsborough County, Residential New Construction Foundation Plan Requirements
- Hillsborough County, Residential New Construction Floor, Roof and Truss
- Hillsborough County, Residential New Construction Walls and Wall Sections
- Florida Senate, Florida Statutes 553.844 (2025), Windstorm loss mitigation; requirements for roofs and opening protection
- Florida Senate, Florida Statutes 553.79 (2025), Permits; applications; issuance
- Florida Senate, Florida Statutes 553.37 (2025)
- Florida Senate, Florida Statutes 553.38 (2025), Application and scope
- City of Tallahassee, Commercial Building Permit
- City of Tampa, Commercial Alterations – Plan Review


