Home / Services / MEP Engineering Florida
Florida · MEP

MEP Engineering Services for Florida Projects

HVAC, electrical and plumbing design with permit drawings for tenant improvements, restaurants, retail and residential projects across Florida.

Chrome Stone Structural provides mechanical, electrical and plumbing (MEP) engineering for commercial tenant improvements, restaurants, retail shops, offices and residential projects across Florida. We design the building systems, prepare the MEP drawings and calculations for permit, and coordinate them with the architectural and structural sets. On the Atlantic coast, see our West Palm Beach page for restaurant build-outs.

We work on projects across Florida. Because we also provide structural engineering, rooftop equipment, its supports and its wind anchorage can be coordinated by one team.

Mechanical (HVAC) Engineering

  • Cooling and heating design: load calculations and system selection for split systems, heat pumps, packaged rooftop units and ductless systems, sized for Florida’s hot and humid climate.
  • Humidity and ventilation: outdoor air and exhaust design for occupied spaces, restrooms and kitchens, with attention to moisture control.
  • Equipment sizing: HVAC equipment, ductwork, diffusers and grilles based on the calculated loads and the use of each space.
  • Commercial kitchens and food service: coordination of hood exhaust, make-up air and refrigerated equipment with the layout.

Electrical Engineering

  • Electrical load calculations to confirm the existing service can carry the new loads, or to size a new service.
  • Panel schedules for new and modified panels, with circuits for lighting, receptacles and equipment.
  • One-line diagrams showing the service, panels, feeders and major equipment.
  • Lighting and power plans for interior spaces and equipment connections.

What a Florida County Asks to See on Electrical Drawings

County permit pages list what electrical drawings must show, and the lists are specific. Hillsborough County’s commercial electrical requirements say the drawings follow the current Florida Building Code and the National Electrical Code. They name a riser diagram showing the type, location and capacity of the service equipment and grounding, the wiring methods and raceway or cable types, the location of every outlet and switch, and panel schedules with loads and overcurrent device ratings. Load calculations and the design flood elevation are also on the list.

The application also needs a recorded Notice of Commencement under section 713.13, Florida Statutes. Other counties set their own lists, so the drawings are matched to the jurisdiction where the project is.

Plumbing and Mechanical Items Florida Plan Reviewers Check

Hillsborough County’s commercial design criteria page lists what plan reviewers look for on the mechanical and plumbing sheets. For mechanical work it names a floor plan with the proposed system, duct work and ventilation, equipment and appliances, heating and cooling loads, ventilation calculations under Chapter 4 of the Florida Building Code, and equipment schedules.

For plumbing it lists minimum plumbing facilities, fixtures and a fixture schedule, water supply lines, sanitary drainage, water heaters, vents, roof drainage, backflow prevention, grease traps and a plumbing riser. Gas piping, venting and combustion air are listed too. Counties write their own lists, so these are the items to expect and then confirm with the local building department.

Plumbing Engineering

  • Domestic water distribution and fixture connections for restrooms, kitchens and service areas.
  • Sanitary waste and vent layouts for new and relocated fixtures.
  • Fixture and equipment coordination for sinks, water heaters and food-service equipment.

What You Receive

  • MEP drawings with mechanical, electrical and plumbing plans, schedules and details.
  • Calculations for HVAC loads, electrical loads and plumbing fixture units as the project requires.
  • Permit documentation from an engineer, ready to submit with the architectural set.
  • Design coordination with the architect, the structural engineer and the contractor.
  • Construction-stage support to answer contractor questions during construction.

How a Florida MEP Project Works

  1. Project review: you send the project city, the floor plan and a description of the space and its use. We confirm the MEP scope and the fee.
  2. Existing conditions: for tenant improvements we review the existing electrical service, HVAC equipment and plumbing connections.
  3. Design and calculations: we size the systems and prepare the MEP plans and schedules.
  4. Permit set: we deliver the MEP drawings for submittal and respond to plan review comments.
  5. Construction: we stay available to the contractor for questions during construction.

For projects in Miami-Dade County, our page on engineering services in Miami-Dade covers the local building departments and wind rules.

Florida Codes Behind MEP Drawings

Florida MEP drawings are designed to the Florida Building Code, which is updated every 3 years. Under section 553.73, Florida Statutes, the Florida Building Commission builds each update from the most current International Mechanical Code, International Plumbing Code and International Fuel Gas Code, together with the National Electrical Code, and it also reviews updates based on the International Energy Conservation Code.

The Commission lists the 8th Edition (2023), effective December 31, 2023, as the edition in force, and the 9th Edition is the next update; see our article on the 9th Edition and permit sets. If an application is filed before a new edition takes effect, the code in effect where it is filed on the application date governs the permitted work, so confirm the edition with the building department before design starts.

Florida MEP Project Example

In Gibsonton, Florida, Chrome Stone designed the MEP systems for a 796 sq ft commercial tenant improvement that turned an existing retail space into a specialty ice cream shop. The design covered HVAC, plumbing and electrical systems for the customer seating, refrigerated display counters, preparation and service areas, storage and utility spaces. Gibsonton is near Tampa; for MEP work around Tampa Bay, see our Tampa and St. Petersburg pages.

Frequently Asked Questions

Do I need MEP drawings for a tenant improvement in Florida?

Florida building departments usually require mechanical, electrical and plumbing drawings when a tenant improvement adds or changes HVAC equipment, electrical circuits or plumbing fixtures. Send us a short description and we will tell you what your project is likely to need.

Can you design MEP and structural for the same project?

Yes. Chrome Stone provides both, which helps coordinate rooftop equipment, its supports and wind anchorage, and openings through roofs and floors.

What do you need from me to prepare a quote?

The project city, the floor plan, the intended use of the space, photos of the existing electrical panel and HVAC equipment for renovations, and any comments you have already received from the building department.

Sources

Our Projects

MEP Projects

Ice cream shop interior with display counters in Gibsonton, FloridaGibsonton, FL · MEP

Portales Ice Cream Tenant Improvement

Activity hall interior with ceiling cutaway showing HVAC equipment in Fresno, CaliforniaFresno, CA · MEP

Community Activity Hall

See All Projects
Request a Quote

Request a Florida MEP Quote

Tell us the project city, the use of the space and the systems that are new or changing.

  • Project city and state
  • Building type and proposed work
  • Required engineering disciplines
  • Architectural or existing-condition drawings available

Prefer to call? +1-279-221-5279


    We will use this address to respond to your inquiry.


    Add it if you prefer a call back.


    City only. A full property address is not needed for this first inquiry.

    Engineering support needed

    California Title 24 applies to California projects only.


    Briefly describe the building, proposed work, and any questions. Do not include passwords, payment details, or confidential documents.

    Add project stage or other details (optional)


    Leave blank if unknown.


    Tell us what the date relates to. The team will confirm feasibility after reviewing the scope.

    We use these details to review and respond to your inquiry. Read our Privacy Policy.

    While we review your project, follow Chrome Stone Structural on LinkedIn for new projects and code updates. Follow us on LinkedIn