Structural and MEP Engineering Insights
Articles on structural and MEP engineering, design coordination and project planning.

Do You Need a Permit and an Engineer for a Retaining Wall in California?
In California, a retaining wall generally needs a building permit when it is more than 4 feet tall, measured from the bottom of the footing to the top of the wall, or when it holds back a surcharge such as a slope, a driveway or a building, at any height. Some cities set a lower limit near steep slopes. A wall that needs a permit almost always needs structural calculations, and most are designed by an engineer.

Florida’s 50% Rule Explained: Substantial Damage and Substantial Improvement
Florida’s “50% rule” is the National Flood Insurance Program’s substantial damage and substantial improvement rule. If a building in a FEMA special flood hazard area is damaged, and repairing it to its pre-damage condition would cost 50 percent or more of the building’s market value, the building is “substantially damaged.” It must then be brought into compliance with current flood requirements, which often means elevating it, rebuilding the foundation or replacing it. The same test applies to remodels and additions. Some Florida cities use a stricter threshold, such as St. Petersburg’s 49 percent.

Do You Need a Structural Engineer for a Patio Cover in California?
Most attached patio covers in California need a building permit, and many need plans with structural calculations. Whether an engineer has to design yours depends on two things: whether your city offers a standard patio cover plan your design fits, and whether the cover stays inside the limits the California Residential Code sets for simple patio structures. A cover with long spans, heavy roofing, a connection to a second floor or a site with high wind usually needs engineering.

After a Florida Condo Milestone Report: SIRS, Repairs and Permits
After a Florida condominium milestone inspection, the association has 45 days to send every unit owner the inspector's summary. If the report finds substantial structural deterioration, a Phase 2 inspection follows, and the repairs it calls for must be started within 365 days. A structural integrity reserve study (SIRS) then sets how much the association must save to keep the building's main systems in repair.

Florida Building Code 9th Edition (2026): What Changes for Permit Sets
The Ninth Edition (2026) of the Florida Building Code takes effect statewide on December 31, 2026. It replaces the Eighth Edition (2023), and it is based on the 2024 International Codes, where the Eighth Edition was based on the 2021 editions. Your permit is governed by the edition in effect on the date you apply, and that edition stays with the permit for its whole life.

Able Industrial Property-Line Fence in Ontario, CA
Structural plans for a 161-foot steel fence, 8 feet tall, above an existing retaining wall at an industrial site in Ontario, CA.

Garage-to-ADU Conversion and Home Renovation in Madera, CA
Structural design for a home renovation and an attached garage converted into a 1,078 sq ft three-bedroom ADU in Madera, CA.

Attached Gable Patio Cover in Madera, CA
Structural design for a 500 sq ft gable-roof patio cover attached to an existing home in Madera, CA, with engineered beams, posts and new footings.

Container Pool and Retaining Walls on a Hillside Lot in Redlands, CA
Foundation and retaining-wall engineering for a 40-foot container pool and spa on a terraced hillside lot in Redlands, CA.